Dsi

Aydın / 2013 – 2014

Welding works of HDPE PE 100 Ø710 pipes and mechanical assembly and disassembly of special structures have been carried out by us in accordance with the technical specifications within the scope of the DSI 21st Regional Directorate Aydın Karacasu Esendere Stream Pond discharge line irrigation project.